Summit / Clear Creek County · I-70

Eisenhower Tunnel

The highest vehicular tunnel in the world, and the single point of failure for the entire Front Range ski corridor.

11,158′
Summit
I-70
Route
Year-round
Access

Current Status

Loading

Checking the latest CDOT report…

Status from CDOT COTrip, refreshed once each morning. This page reports what CDOT publishes — for a legal closure or an active incident, cotrip.org and CDOT variable message signs are authoritative.

Overview

The Eisenhower-Johnson Memorial Tunnel carries I-70 under the Continental Divide at 11,158 feet. Roughly 30,000 vehicles pass through on a winter Saturday. When it closes, there is no quick alternative: traffic backs up to Silverthorne westbound and Georgetown eastbound, and the detour over Loveland Pass adds an hour in good conditions and is often closed itself in the same storm.

Why It Closes

Crashes inside the bore

A single spun-out vehicle stops both bores while crews clear it. This is the most common cause of a tunnel closure and typically lasts 20-60 minutes.

Metering during storms

CDOT meters traffic into the tunnel rather than closing it outright. Expect stop-and-go from Silverthorne on heavy days.

Hazmat restrictions

Hazardous-materials loads are permanently banned from the tunnel and must use Loveland Pass. When Loveland closes, those loads have nowhere to go.

Traction and chain law

Code 15 traction law is common from October through May. Code 16 (chains for all vehicles) shuts out anything unequipped.

Timing It

Westbound backs up Friday afternoon and Saturday morning. Eastbound is worst Sunday 1-6 PM. If you can move outside those windows, do. The tunnel itself rarely closes for weather alone — it closes because of what happens on the approaches.

Alternate Routes

Loveland Pass (US 6) is the only real alternate, and it is higher, unlit, and closes more often than the tunnel does. In a serious storm both go down together. The genuine alternate is waiting.

Common Questions

Why does the Eisenhower Tunnel close?

Most Eisenhower Tunnel closures are caused by crashes inside the bore rather than by weather directly. A single spun-out vehicle stops traffic in both directions until crews clear it, typically for 20 to 60 minutes. CDOT more often meters traffic into the tunnel during storms rather than closing it outright.

What is the alternate route when the Eisenhower Tunnel is closed?

Loveland Pass on US 6 is the only direct alternate, climbing to 11,990 feet over the Continental Divide. It is higher and more exposed than the tunnel, so in a significant storm both routes often close at once. Hazardous-materials loads are required to use Loveland Pass at all times.

How high is the Eisenhower Tunnel?

The Eisenhower-Johnson Memorial Tunnel sits at 11,158 feet at its highest point, making it the highest vehicular tunnel in the world. It carries I-70 under the Continental Divide between Summit and Clear Creek Counties.

Other Passes

Vail Pass Conditions

I-70 · 10,662 ft · Copper Mountain to Vail.

Loveland Pass Conditions

US 6 · 11,990 ft · Arapahoe Basin and Keystone to Georgetown.

Hoosier Pass Conditions

CO 9 · 11,542 ft · Breckenridge to Fairplay.

All Pass Conditions

Live status for all seven passes and highway segments we track.